Saturday, October 4, 2014

Bottom Work Complete

Just returned from the boatyard. We took inventory on work that needs doing before the splash back. There was a consensus on the topside hull finally needing some paint. The previous paint job surely held up well, but there are signs of oxidation and general wear. In addition, some deck paint, finishing up the hatch work, and putting the mast and rigging back.

The bottom paint looks great.